Project: CH750-SR   -  
            Listing for Category : Landing Gear
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Skip Rhudy   -  
Project:   Zenair - CH 750   -   VIEW REPORTS
Total Hours:551
Total Flight Time:
Total Expense:N/A
Start/Last Date:Sep 17, 2019 - No Finish Date
Engine:Corvair
Propeller:Sensenich W642KL-35GS
 
Friendly URL: https://eaabuilderslog.org?s=CH750-SR

Home or Last Project Picture

Mar 01, 2023     Critical Electrical And Panel Area - (15 hours)       Category: Landing Gear
Bought 4x8 sheet of .025 from Airparts. Didn't have metal brake so used rubber mallet method of bending instrumentation wiring support pans between firewall and panel. Bent against grain by accident, however do not believe will be a problem given the non-structural nature and very low weight of service loops of wiring the pans will support. The battery, contactor, and distribution bus is mounted behind the passenger seat. Battery location reinforced with .092 extruded L and wrapped tight with sheet metal to resist high g loads in sudden stop situation. Fabrication and planning of these items took a long time. Acquired a small sheet metal bender for the smaller brackets that the bus and the contactor are mounted on. Used .016 L-angle as "finger" to get appropriate bend radius on those items. Used rubber mallet to create flange that cheap metal brake design doesn't support.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.